July 2026
POLICY BRIEF
ESDA
European Security and Defence Alliance
A European defence upgrade within existing budget frameworks — policy brief and visual documentation

ESDA is an original policy proposal for a new European defence alliance established through an independent treaty (the EDE — European Defence Ecosystem) outside EU frameworks. The proposal addresses the four structural weaknesses that render Europe incapable of independent action in a major conflict: dependence on the United States, EU institutional constraints, fragmented national forces and procurement — and the absence of a common standing response force.

Contents
Part 1 Policy Brief s. 2–4
  • 1. The problem — and the cost of inaction
  • 2. ESDA — what it concretely is
  • 3. Governance and sovereignty
  • 4. Personnel — size and composition
  • 5. Economics — not new money
  • 6. What is required now — Phase 0
  • 7. Three recommendations
Part 2 Visual documentation s. 5–12
  • Infographic 1 — Europe's four structural weaknesses5
  • Infographic 2 — ESDA, NATO and national defence forces6
  • Infographic 3 — The four pillars and shared structures7
  • Infographic 4 — Governance structure and chain of command8
  • Infographic 5 — The Tier model9
  • Infographic 6 — Implementation10
  • Infographic 7 — Funding11
  • Infographic 8 — Personnel and budget12
  • Infographic 9 — Cost breakdown13
Policy Brief · July 2026
European Security and Defence Alliance (ESDA)
A European defence upgrade within existing budget frameworks — what it requires, and what it costs not to act
In February 2026, more than 40 heads of state and government at the Munich Security Conference acknowledged that the US security guarantee can no longer be taken for granted. The political moment is here — the institutional response is still lacking.
What needs to be decided?

Europe is structurally dependent on the United States for key capabilities that no European state can provide alone. ESDA is a concrete proposal for a new treaty-based alliance — adding shared capabilities on top of national defence forces without replacing NATO.

The next 0–12 months (Phase 0) are the critical window: this is where the foundation is laid. Countries not participating now will have no influence on the design of the treaty.

What happens if Europe fails to act?

Continued dependence on a single ally whose strategic priorities are shifting. In a crisis, European countries will be left with large national armies that cannot coordinate, lack shared logistics, and have no access to the capabilities that determine modern warfare: ISR (Intelligence, Surveillance, and Reconnaissance), aerial refuelling, precision missiles and cyber defence.

The threats Europe will need to manage in 15, 20 or 30 years are unknown today. ESDA is Europe's insurance against the unknown — not only the answer to what we already see.

The cost of inaction is a permanently vulnerable and ineffective European defence.

1. The problem — and the cost of inaction

Europe has never spent more on defence. Yet Europe lacks the capabilities required for independent action in a major conflict on European soil. The cause is structural — not budgetary.

2. ESDA — what it concretely is

ESDA is not a European army and not an alternative to NATO. It is a shared capability layer — four pillars — that delivers what no single state can provide alone, and which requires a new independent treaty: the European Defence Ecosystem (EDE) outside EU frameworks.

Pillar What it delivers Why it is the key
Pillar 1 — ERF
response force
Maritime and littoral response force. 70–110,000 military and civilian personnel. Drone carriers (EAC), missile platforms (AMP), layered air defence. The visible, mobile deterrent. Can operate independently for 60–90 days.
Pillar 2 — EIA
intelligence
European satellite constellation (Europe currently operates only 49 military satellites compared to the US's 246), AEW&C aircraft, HALE drones, Cyber Command and AI analysis platform. Europe gains its own common operational picture. Independence from US ISR capabilities.
Pillar 3 — ESCL
logistics
200 transport aircraft, 40 aerial refuelling aircraft (MRTT), sealift (Ro-Ro), shared stockpiles at five strategic hubs. European forces can move and be sustained. Ends dependence on US strategic airlift. The MRTT fleet and EIA's common operational picture together make national combat aircraft far more effective as one coordinated European air force — without ESDA needing its own combat aircraft.
Pillar 4 — EDPA
standards & procurement
Common standards, procurement and industrial readiness. Plans for rapid scaling of ammunition and missiles. Money is used more effectively. Europe can produce enough in wartime.

Relationship with NATO: ESDA does not duplicate NATO. ESDA forces can be made available for NATO-led operations. Standards are built on NATO STANAGs. Planning is conducted in coordination with SHAPE. ESDA addresses the European capability gap — NATO addresses the collective defence article and nuclear planning.

3. Governance and sovereignty

The EDE Treaty establishes ESDA outside EU treaty frameworks — no EU unanimity requirement, full participation of the UK and Norway possible. The ESDA Council (defence ministers) takes decisions by two-thirds majority. No single state holds a veto right in day-to-day operations.

The Tier model protects national sovereignty

The critical tension in any supranational defence body is: who decides when? The Tier model resolves this:

Tier What Examples Decision
A Core capabilities and support ISR, aerial refuelling, transport, cyber defence ESDA Council two-thirds majority. Pre-authorised — no individual case-by-case approval required.
B Limited combat operations Critical infrastructure protection, counter-piracy, limited precision strikes ESDA Council two-thirds majority. Normally pre-authorised via national framework legislation.
C Large-scale combat participation Prolonged high-intensity operations ESDA Council two-thirds majority + separate national participation decision in each country.

Why two-thirds — and not unanimity or a simple majority?
Europe has two models to learn from — both are unworkable for ESDA. The US president can order operations within hours. This provides agency, but is inconceivable in an alliance of equal states. The EU requires unanimity in defence matters — thereby giving a single country the power to paralyse all others. ESDA chooses a third way: a two-thirds majority ensures a substantial, legitimate mandate behind every decision — but no single state can block. A three-quarters requirement would recreate the EU's problem in another guise. A simple majority would drag a reluctant minority along against their will. Two-thirds is the precise threshold at which ESDA can act — and not be paralysed.

Each country adopts a national ESDA framework law upon ratification. The framework law pre-authorises Tier A and the majority of Tier B, establishes access to infrastructure and ensures parliamentary information — without paralysing decision-making through demands for case-by-case approval.

4. Personnel — size and composition

At full force target, ESDA will be manned by approximately 177,000 personnel across the four pillars and shared structures.

Pillar Function Personnel
Pillar 1 — ERF Maritime/littoral response force ~110,000
Pillar 2 — EIA ISR, space, cyber and AI ~20,000
Pillar 3 — ESCL Strategic airlift, aerial refuelling and logistics ~35,000
Pillar 4 — EDPA Standardisation and procurement ~5,000
Shared structures The Citadel and others ~7,000
Total ~177,000

Personnel comprise a combination of directly employed ESDA staff, long-term seconded national personnel and contracted specialists. The rotation system ensures close ties to national environments.

5. Economics — not new money

The most important political argument: ESDA does not require money beyond NATO's long-term 5% target for defence and security. A clearly defined share of this framework is ring-fenced for shared capabilities — the rest remains national. EU member states' combined defence budgets rose from €218bn in 2021 to €343bn in 2024 — the money is already moving. ESDA's ~€57bn/year represents less than 15% of this figure and constitutes the shared capability layer that no single state can provide alone.

ESDA is a reallocation, not an additional bill. The money will be spent regardless — the question is whether it is spent in fragmented national silos or pooled at the European level.

Two scenarios
  GDP base Build-up (year 1–15) Operating (from year 15)
Scenario A
All EU + UK + Norway
~€24,000bn/year 0.28% → ~€67bn/year 0.24% → ~€57bn/year
Scenario B
Core group (~15 countries incl. DK)
~€22,000bn/year 0.30% → ~€67bn/year 0.26% → ~€57bn/year

The absolute budget is identical in both scenarios (~€67bn/year during build-up). Scenario B starts with fewer countries and therefore a higher GDP share per country — but is not a permanent inner circle. The EDE Treaty is designed for easy accession, and the GDP contribution per country falls as more join.

Contingency reserve: A 20% reserve (~€12bn/year in operating phase) is held in a shared, non-earmarked ESDA reserve. Released only by a two-thirds decision of the ESDA Council. Used to close critical gaps and manage price increases on key components.

6. What is required now — Phase 0

ESDA is built up over 15 years. But the window for political influence over the treaty's design is now. Phase 0 (0–12 months) is about establishing the foundation that determines everything that follows.

Task in Phase 0 Content
Founding group (5–10 countries) Political declaration of intent to establish ESDA. Agreement on the EDE Treaty's fundamental principles and division of responsibilities. An independent treaty authority appointed.
EDE Treaty text Drafted and negotiated. The key principle is that ESDA is shaped without any single country's interests dominating the design. Standardised national framework laws prepared in parallel for ratification.
The Citadel — interim HQ Located in Brussels. The Triumvirate (Civil Director, Chief of Defence, High Representative) appointed.
Parliamentary oversight Oversight council with parliamentarians from the founding countries. Independent audit follows the build-up from day one.
Four 'must wins' Visible results within 24 months: common ammunition contracts (EDPA), aerial refuelling agreements (ESCL), AEW&C aircraft and first LEO satellites (EIA), first drone carrier (ERF).

Phase 1 (year 1–2): Ratification and launch of key programmes. Phase 2 (year 3–7): Initial Operational Capability in all pillars, ERF at 70–80,000. Gate 1 (end of year 7): Mid-term review — programmes that have not reached IOC milestones are terminated. Phase 3 (year 8–15): Full Operational Capability.

7. Three recommendations

There are three decisions that must be taken now. They are interdependent — but the first is the prerequisite for the other two.

Recommendation 1: Declare political intent and join the founding group
A founding group of 5–10 countries lays the foundation for the EDE Treaty. Countries participating now will have influence over the treaty's design — including decision rules, the funding model and the Tier structure. Countries that wait will accede to terms set by others. The government should, before Q3 2026, formally declare its intent to participate in the founding group and actively engage in the initial negotiations.
Deadline: Q3 2026 — political declaration
Recommendation 2: Allocate resources for Phase 0 in the defence budget
Participation in the founding group and Phase 0 is not cost-free: treaty negotiations, contributions to The Citadel establishment and preparation of the national framework law require resources. The appropriation is small relative to the long-term commitment — but critical for maintaining negotiating strength. The funds should be allocated in the defence budget for 2026/2027.
Deadline: Finance Act 2026/2027
Recommendation 3: Initiate national legislative preparatory work now
The national ESDA framework law is a prerequisite for Tier A and B to be activated automatically. Drafting the law requires clarification of constitutional frameworks, division of responsibility and parliamentary procedures — this takes time. A legislative preparatory committee should be established now, so that a completed legal text is ready for ratification when the EDE Treaty is available. Waiting until the treaty is in place means losing 12–18 months.
Deadline: Establish committee: Q3 2026
Infographic 1 · ESDA

Europe's four structural weaknesses

Europe spends large sums on defence — but the underlying structural problems cannot be resolved by higher national budgets alone. Four weaknesses are at the core of the problem.

01
Structural dependence on the United States
Europe lacks critical key capabilities and is heavily dependent on the United States to operate independently:
  • Strategic airlift and aerial refuelling
  • Airborne early warning and control (AEW&C / AWACS)
  • Satellite surveillance and signals intelligence (SIGINT)
  • Certain long-range precision weapons
02
EU frameworks cannot deliver — and never will
The EU's unanimity requirement structurally blocks the type of alliance ESDA requires. PESCO and EDA have not delivered and cannot deliver:
  • A common standing military force
  • A supranational command structure with genuine decision-making authority
  • Common, binding standardisation
03
Fragmented forces and procurement
European countries operate in silos with significant efficiency losses:
  • Many parallel platforms and logistics systems
  • Short production runs with high unit costs
  • Limited shared ammunition stockpiles
  • Budgets do not translate into real deterrence
04
No common standing response force
Europe has no common force that can be rapidly and independently deployed in its own neighbourhood. Even with political will, the capability is absent:
  • National forces operate within separate command structures
  • Response capability depends on NATO mobilisation
  • In the first 60–90 days of a major conflict, Europe is effectively dependent on the United States choosing to engage
The consequence: Europe today cannot move and sustain larger forces over distance, maintain a continuous common operational picture or conduct coherent high-intensity operations — not even in its own neighbourhood — without US support. Europe has no common standing force ready for independent deployment. In a situation where US strategic focus shifts or engagement fails to materialise, Europe is vulnerable in precisely that critical initial time window.
Infographic 2 · ESDA

ESDA, NATO and national defence forces

ESDA is not a replacement for national armies and not an alternative to NATO. It is a new shared capability layer — a supplement that delivers what no single state can provide alone.

NATO
Collective defence and nuclear deterrence
Article 5 — collective defence obligation Nuclear planning SHAPE / global kommandostruktur Transatlantic anchoring
↕ ESDA coordinates closely with NATO through permanent liaison elements
ESDA
Shared European capabilities — the new layer
ERF — maritime/littoral response force EIA — ISR, space and cyber ESCL — airlift and logistics EDPA — standards and procurement EDE-traktaten Two-thirds majority decisions
↕ ESDA does not replace, but supplements and reinforces
National defence
National armies, navies and air forces — preserved and strengthened as one coordinated entity
Army Navy Air force National defence budget National command
ESDA is not and will not become:
A parallel to NATO's Article 5
A separate nuclear planning structure
A replacement for national armies
A tool to be used against its own member states
A global intervention force
A copy of SHAPE's global command
Infographic 3 · ESDA

The four pillars and shared structures

ESDA is organised around four pillars and shared structures that together deliver the shared capabilities no single state can provide alone. The pillars operate in an integrated manner and reinforce one another.

PILLAR 1
ERF
European Response Force
Maritime and littoral response force — visible, mobile deterrent capable of operating independently for 60–90 days.
110,000
Military and civilian
€40bn
Operating/year
25 Maritime Strike Regts. 10 Drone carriers (EAC) 20 Missile platforms (AMP) MALE Droner Layered air defence ESOF special operations forces 5 strategic hubs
PILLAR 2
EIA
European Intelligence Agency
European ISR, space and cyber — gives Europe its own common operational picture independent of the United States.
20,000
Military and civilian
€7bn
Operating/year
Argus constellation (50 LEO) 15 AEW&C-fly 30 HALE-droner Cyber Command AI Fusion Hub
PILLAR 3
ESCL
European Strategic Command & Logistics
European strategic airlift, sealift and logistics — ends dependence on US strategic lift.
35,000
Military and civilian
€8bn
Operating/year
200 transport aircraft 40 aerial refuelling aircraft (MRTT) 10–12 Ro-Ro-skibe Shared stockpiles at 5 hubs Integration officer corps
PILLAR 4
EDPA
European Defence Procurement Authority
Common standards, procurement and industrial readiness — money is used more effectively, and Europe can produce enough in wartime.
5,000
Military and civilian
€2bn
Operating/year
ESDA Defence Standard Catalog Joint Procurement Cells Industrial readiness Strategic commodity reserves
Shared structures
The Citadel (Headquarters)  ·  Training and test centres  ·  Depot centres
~7,000
Military and civilian
~177,000
Total personnel
€69bn
Total operating/year incl. contingency reserve
0.29% GDP
Of European GDP (Sc. A)
Infographic 4 · ESDA

Governance structure and chain of command

ESDA is led by three equal senior officials — the Triumvirate — under the political control of the ESDA Council. The chain of command is simple and designed for rapid decision-making.

Level III · Political leadership
ESDA Council
Defence ministers · 1 vote per member state · No national veto right in day-to-day operations
2/3 → Operations and budgets 3/4 → Exclusion Unanimity → Treaty amendments
Level IV · Supreme executive authority
Triumviratet
Civil Director
Strategy development, budget and financial management. Institutional development.
Chief of Defence
Four-star officer. Overall military responsibility. Commands the four pillars.
High Representative
Foreign affairs, security and communications responsibility. External relations.
Level V · Military professional leadership council
Board of Department Chiefs
ERF Chief EIA Chief ESCL Chief EDPA Chief ESOF Chief
PILLAR 1
ERF
Response force
PILLAR 2
EIA
Intelligence
PILLAR 3
ESCL
Logistics
PILLAR 4
EDPA
Procurement
The Citadel
Permanent HQ · Joint Operations Center (24/7) · Joint Planning Directorate · Cyber/EW & AI Fusion Center · ~5,000 staff
Infographic 5 · ESDA

The Tier model: agency and sovereignty

The Tier model resolves the central question in any supranational defence body: who decides when? The model balances rapid collective agency with full respect for national constitutions.

A
Core capabilities and support
What does it cover?
Capabilities necessary for Europe to see, move and protect — typically without direct use of lethal force.
Examples
ISR (satellites, AEW&C, drones) · Aerial refuelling · Strategic transport · Logistics and supply stockpiles · Cyber defence
Decision
ESDA Council by two-thirds majority. Pre-authorised via national framework laws.
No individual case-by-case approval
B
Limited combat operations
What does it cover?
Operations involving use of force, but with a clearly defined purpose, duration and controlled risk.
Examples
Protection of critical infrastructure · Counter-piracy · Limited precision strikes · Maritime security operations
Decision
ESDA Council by two-thirds majority. Normally pre-authorised. Certain high-risk missions may require an additional national process.
Normally no individual approval required
C
Large-scale combat operations
What does it cover?
Operations equivalent to actual "combat participation" with significant risk of casualties and escalation.
Examples
Prolonged, high-intensity combat operations · Operations with risk of counter-strikes on member states' territory
Decision
ESDA Council by two-thirds majority for overall mandate + separate national participation decision in each country where required.
National approval may be required
The fundamental principle: Each member state adopts a national ESDA framework law upon ratification. The framework law pre-authorises Tier A and the majority of Tier B, enabling ESDA to act quickly — without waiting for separate parliamentary approval case by case. Tier C respects national constitutions: the participation decision follows each country's own procedures — countries that do not approve do not contribute forces.
Infographic 6 · ESDA

Implementation — from treaty to full capability

ESDA is built up over 15 years in four phases with a mid-term review (Gate 1) at year 7. The politically critical window is Phase 0 — now: this is where the foundation is laid and the treaty design locked in.

F0
Year 0–1
Phase 0
Establishment
  • Founding group 5–10 countries
  • EDE Treaty negotiated
  • The Citadel established (Brussels)
  • The Triumvirate appointed
  • First common ammunition contracts
  • First aerial refuelling aircraft agreements
  • First drone carrier initiated
  • Parliamentary oversight established
F1
Year 1–2
Phase 1
Ratification
  • EDE ratified
  • National framework laws adopted
  • ESDA Council operational
  • ERF: Landing ships ordered, response forces designed
  • EIA: Surveillance satellites + AEW&C aircraft + HALE drones ordered
  • ESCL: 80–100 transport aircraft + 20 aerial refuelling aircraft
  • EDPA: Common standard catalogue v1, procurement cells established
  • ESDA Defence Academy established
F2
Year 3–7
Phase 2
IOC all pillars
  • ERF: 70–80,000 active, 8–10 maritime response forces
  • 2–3 drone carriers, 8–10 missile platforms, 60–80 landing ships
  • 20–24 combat drones at hubs
  • EIA: 10–15 surveillance satellites, 6–8 AEW&C aircraft, 12–18 HALE drones
  • ESCL: 20–25 aerial refuelling aircraft, 80–100 transport aircraft, 6–8 cargo vessels
  • Stockpiles: 30 days' operating capacity at hubs
  • EDPA: Common framework agreements on ammunition
G1
End of year 7
Gate 1
Review
  • Independent audit
  • Programmes assessed
  • Adjusted or terminated
  • Only IOC-reaching programmes continued
  • National combat participation procedures reviewed
F3
Year 8–15
Phase 3
Full capability
  • ERF: 100,000 military personnel, all 25 maritime response forces
  • 6–8 drone carriers, 20 missile platforms, 150 landing ships
  • 36 combat drones (European platforms)
  • 30 "arsenal aircraft" for stand-off strikes
  • EIA: Up to 50 surveillance satellites, 15 AEW&C aircraft, 30 HALE drones
  • ESCL: 200 transport aircraft, 40 aerial refuelling aircraft, 10–12 cargo vessels
  • Stockpiles: 60 days' capacity, permanent headquarters
Phase 0
is the critical window. Countries participating now have influence over the treaty's design — countries that wait accede to terms set by others.
15 years
to full operational capability — but ESDA can conduct real Tier A and B operations from Phase 2 (year 3–7) onwards.
Gate 1
ensures that only programmes that work are continued. Incremental build-up significantly reduces the risk of wasted investment.
Infographic 7 · ESDA

Funding — not new money

ESDA does not require money beyond NATO's long-term 5% target. A clearly defined share of this existing framework is ring-fenced for shared European capabilities — the rest remains national.

NATO's 5% target — allocation of GDP
Full bar width = 5% of GDP · Source: NATO/EDA 2024, ESDA Report 2026
3.5% — Military core defence
1.5% — Security & preparedness
Today
EU average ~1.9%
range: ~1–4.1%
Current spending ~1.9% GDP
Unallocated — path towards 5% target by 2035
5%
With ESDA ring-fenced within the unallocated portion
Scenario A
All EU + UK + Norway
Current ~1.9%
Remaining unallocated capacity
5%
Scenario B
Core group 15 countries incl. DK
Current ~1.9%
Remaining unallocated capacity
5%
Current European defence spending (~1.9% GDP)
ESDA — Scenario A, operating (0.24% GDP)
ESDA — Scenario B, operating (0.26% GDP)
Unallocated — path towards 5% target
3.5% threshold
Scenario A
All EU countries + UK + Norway (~€24,000bn/year)
0.28%
GDP per country — build-up
~€67bn
Total/year — build-up
0.24%
GDP per country — operating
~€57bn
Total/year — operating
Scenario B
Core group ~15 countries incl. DK (~€22,000bn/year)
0.30%
GDP per country — build-up
~€67bn
Total/year — build-up
0.26%
GDP per country — operating
~€57bn
Total/year — operating
The absolute budget is identical in both scenarios (~€57bn/year in operating phase, ~€67bn/year during build-up). Scenario B starts with fewer countries and a slightly higher GDP contribution per country — but is not a permanent inner circle. As more countries join the EDE Treaty, the contribution per country automatically falls towards Scenario A levels.
Infographic 8 · ESDA

Pillars: personnel and budget at full capability (from year 15)

Overview of personnel, annual operating budget and GDP share per pillar at full force target. Figures are indicative orders of magnitude.

Pillar / structure Personnel Budget/year GDP share
Sc. A (≈)
GDP share
Sc. B (≈)
Share of
total
Pillar 1 — ERFEuropean Response Force 110,000 €40bn/year approx. 0.17% approx. 0.18%
70%
Pillar 2 — EIAEuropean Intelligence Agency 20,000 €7bn/year approx. 0.029% approx. 0.03%
12%
Pillar 3 — ESCLEuropean Strategic Command & Logistics 35,000 €8bn/year approx. 0.03% approx. 0.04%
14%
Pillar 4 — EDPAEuropean Defence Procurement Authority 5,000 €2bn/year approx. 0.01% approx. 0.01%
3%
Shared structuresThe Citadel and others 7,000 Included in pillars
ESDA total (excl. contingency reserve) approx. 177,000 ~€57bn/year approx. 0.24% approx. 0.26% 100%
+ 20% contingency reserve + ~€12bn/year + approx. 0.050% + approx. 0.055%
ESDA incl. contingency reserve approx. 177,000 ~€69bn/year approx. 0.29% approx. 0.31%
Operating budget distribution
€40bn/year
ERF (Pillar 1)
€7bn/year
EIA (Pillar 2)
€8bn/year
ESCL (Pillar 3)
€2bn/year
EDPA (Pillar 4)
€12bn/year
Contingency reserve (20%)
Infographic 9 · ESDA

Cost breakdown — build-up vs. operating

The build-up phase and the operating phase have markedly different cost profiles. In the build-up phase, platforms and weapons dominate — in the operating phase, personnel and maintenance take over.

Build-up phase (year 1–15)
~€67bn/year
Platforms
45–50%
Ships, aircraft, drones, vehicles — EAC, AMP, LSM, transport aircraft, MRTT, Ro-Ro, Argus satellites, AEW&C, HALE drones.
Weapons and ammunition stockpiles
20–25%
Stand-off weapons, anti-ship and air defence missiles, artillery, naval mines. War Reserve Stockpiles for 60–90 days of high-intensity operations.
Enablers (C2, SATCOM, cyber/EW)
10–15%
C2/CIS infrastructure, tactical data links, SATCOM, AI Fusion Hub, MCM systems, medical facilities.
Bases and infrastructure
10–15%
The five hubs (Tromsø, Rostock, Crete, Rota, Constanța), The Citadel HQ, training and test centres.
Education and exercises
5–10%
ESDA Defence Academy, joint exercises, simulators, integration officers and staff exercises.
Operating phase (at full capability, year 15)
€69bn/year incl. contingency reserve
Personnel costs
40–50%
Salaries, training, basic equipment for ~177,000 full-time equivalents. Particularly heavy in ERF and ESCL.
O&S (operations and support)
30–40%
Maintenance, spare parts, upgrades, fuel, exercises and ongoing operation of platforms.
Modernisation and technology upgrades
10–15%
Replacement and upgrading of EIA capabilities (satellites, sensors, AI), EDPA standards, cyber/EW updates.
Stockpile replenishment and industrial readiness
5–10%
War Reserve Stockpile rotation, industrial readiness testing, cold standby capabilities, Strategic Commodity Reserves.
The shift from build-up to operating phase
In the build-up phase, heavy investments in platforms and weapons dominate (65–75% of the budget). In the operating phase, personnel and O&S account for the majority (70–90% of the budget). This is the normal transition from build-up to operating a standing alliance.
Note: The percentage distributions apply across all four pillars combined and will naturally vary slightly over time and between pillars. The build-up phase funds of ~€67bn/year represent the same absolute amount in Scenario A and B — only the GDP percentage per country varies.